Protocolo para administração contratual de obras públicas: registro de eventos supervenientes relativos ao aumento de custos extraordinários na fase de implantação da obra, para manutenção do equilíbrio econômico-financeiro

dc.contributor.advisorVéras, Juliana Claudino
dc.contributor.advisor-coJosé Celestino Marini
dc.contributor.advisorLatteshttps://lattes.cnpq.br/8199104094050794
dc.contributor.authorPaz, Ricson Mateus Santos da
dc.contributor.authorLatteshttps://lattes.cnpq.br/8304837268388521
dc.date.accessioned2026-08-13T14:57:41Z
dc.date.issued2026-02-12
dc.degree.departamentUACSA
dc.degree.graduationEngenharia Civil
dc.degree.levelbachelor's degree
dc.degree.localCabo de Santo Agostinho
dc.description.abstractA administração contratual de obras públicas enfrenta desafios crescentes diante da volatilidade econômica e de eventos supervenientes que comprometem o equilíbrio econômico-financeiro dos contratos. O presente trabalho tem como objetivo principal estruturar um protocolo de controle documental para o registro de eventos previsíveis e imprevisíveis de consequências incalculáveis, visando fundamentar e prevenir reivindicações de reequilíbrio contratual. A metodologia adotada compreendeu uma revisão bibliográfica sobre os conceitos de reequilíbrio econômico-financeiro, álea ordinária e extraordinária, matriz de riscos, administração contratual e gestão de riscos, seguida de uma análise quantitativa das variações de preços de insumos críticos (aço, cimento, asfalto e diesel) em comparação aos índices inflacionários oficiais durante a pandemia de Covid-19, a Guerra Rússia-Ucrânia e as mudanças na política de preços da Petrobras. Adicionalmente, realizou-se um estudo de caso de um contrato do DERSP, demonstrando o impacto financeiro real na planilha orçamentária. Os resultados evidenciaram um descolamento significativo entre os índices de reajuste e os custos reais de mercado, onde os insumos apresentaram altas acumuladas muito superiores à inflação, gerando um desequilíbrio econômico-financeiro evidente. Conclui-se, assim, que a mera aplicação de índices contratuais é insuficiente em cenários de crise. Em contrapartida, para assegurar o direito da contratante e da contratada, foi proposto um protocolo documental que abrange diversos documentos de cunho contratual, contábil, de registro e controle, comunicação, entre outros, a fim de registrar tempestivamente qualquer evento superveniente e garantir a rastreabilidade das informações. O objetivo é comprovar o nexo causal, assegurar a recomposição de quaisquer desequilíbrios e garantir a sustentabilidade do empreendimento.
dc.description.abstractxContract administration of public works faces increasing challenges due to economic volatility and supervening events that compromise the economic-financial equilibrium of contracts. The main objective of this work is to structure a documentary control protocol for recording foreseeable and unforeseeable events with incalculable consequences, aiming to substantiate and prevent claims for contractual rebalancing. The methodology adopted comprised a bibliographic review on the concepts of economic-financial rebalancing, ordinary and extraordinary risks, risk matrix, contract administration, and risk management, followed by a quantitative analysis of price variations of critical inputs (steel, cement, asphalt, and diesel) compared to official inflation indices during the Covid-19 pandemic, the Russia-Ukraine War, and changes in Petrobras' pricing policy. Additionally, a case study of a DER-SP contract was carried out, demonstrating the real financial impact on the budget spreadsheet. The results evidenced a significant detachment between readjustment indices and real market costs, where inputs showed accumulated increases far superior to inflation, generating an evident economicfinancial imbalance. Thus, it is concluded that the mere application of contractual indices is insufficient in crisis scenarios. In counterpart, to ensure the rights of both the contracting party and the contractor, a documentary protocol was proposed covering various accounting, registration, contract documents, control, and communication documents, among others. This aims to record any supervening event in a timely manner and guarantee information traceability, thereby proving the causal link, ensuring the recomposition of any imbalances, and guaranteeing the sustainability of the undertaking.
dc.format.extent103 f.
dc.identifier.citationOLIVEIRA, João Gabriel Gouveia de. Protocolo para administração contratual de obras públicas: registro de eventos supervenientes relativos ao aumento de custos extraordinários na fase de implantação da obra, para manutenção do equilíbrio econômico-financeiro. 2026. 103 f. Trabalho de Conclusão de Curso (Graduação em Engenharia Civil) - Unidade Acadêmica do Cabo de Santo Agostinho, Universidade Federal Rural de Pernambuco, 2026.
dc.identifier.urihttps://arandu.ufrpe.br/handle/123456789/9055
dc.language.isopt_BR
dc.publisher.countryBrazil
dc.publisher.initialsUFRPE
dc.rightsopenAccess
dc.rights.licenseAttribution-NonCommercial-NoDerivatives 4.0 Internationalen
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/
dc.subjectObras públicas
dc.subjectAdministração contratual
dc.subjectDocumentação - Normas
dc.subjectEquilíbrio econômico
dc.subjectEventos supervenientes
dc.titleProtocolo para administração contratual de obras públicas: registro de eventos supervenientes relativos ao aumento de custos extraordinários na fase de implantação da obra, para manutenção do equilíbrio econômico-financeiro
dc.typebachelorThesis

Arquivos

Pacote original

Agora exibindo 1 - 1 de 1
Imagem de Miniatura
Nome:
tcc_ricsonmateussantosdapaz.pdf
Tamanho:
1.27 MB
Formato:
Adobe Portable Document Format

Licença do pacote

Agora exibindo 1 - 1 de 1
Nenhuma Miniatura Disponível
Nome:
license.txt
Tamanho:
1.87 KB
Formato:
Item-specific license agreed upon to submission
Descrição: