Engenharia Mecânica (UACSA)

URI permanente desta comunidadehttps://arandu.ufrpe.br/handle/123456789/2919

Siglas das Coleções:

APP - Artigo Publicado em Periódico
TAE - Trabalho Apresentado em Evento
TCC - Trabalho de Conclusão de Curso

Navegar

Resultados da Pesquisa

Agora exibindo 1 - 4 de 4
  • Imagem de Miniatura
    Item
    Estruturação e implementação do planejamento e controle de manutenção em uma indústria de ração animal
    (2024-02-27) Souza, Matheus Victor Rêgo de; Moura, Alexandre Douglas Araújo de; http://lattes.cnpq.br/3602476790054326; http://lattes.cnpq.br/5282063337624711
    The production of animal feed is an intricate activity that demands the implementation of efficient and effective processes. To achieve this objective, it is crucial to properly maintain the assets involved, aiming to increase the reliability, availability and quality of products, in addition to reducing costs. In this context, this work proposed to present the structuring and implementation of Maintenance Planning and Control (PCM) in an animal feed factory. The process began with a comprehensive study of the plant, its processes and machinery. The literature consulted provided essential information that was applied consistently and aligned with the company's specific needs and reality. Additionally, data relating to the first 14 months of maintenance planning and control operation were analyzed. During this analysis, crucial indicators were examined, such as the number of work orders (corrective, preventive, lubrication), MTBF (mean time between failures ) and MTTR (mean time to repair). This approach enabled an in-depth understanding of the current status of the plant and its assets, providing valuable insights to continually improve production and maintenance processes. Keyword: planning; control; maintenance; availability.
  • Imagem de Miniatura
    Item
    Desenvolvimento de um aplicativo para gestão de treinamentos do time de manutenção em uma indústria metalúrgica do Polo Industrial de SUAPE – Cabo de Santo Agostinho
    (2024-09-24) Santos, Gustavo Felix dos; Silva, Karla Carolina Alves da; http://lattes.cnpq.br/6261877082189807; http://lattes.cnpq.br/1876824907649818
    This work presents the development of an application designed to complement traditional training management methods within an organization. The application, developed on the PowerApps platform using a Low Code approach, aims to facilitate the monitoring and management of employee training in the maintenance department of a company located in the Suape industrial complex, Cabo de Santo Agostinho. Its main objective is to provide a digital platform that allows the verification of the training status of maintenance technicians, identifying those in "Attention", "Expired," and/or "OK" status. Traditionally, this data has been managed manually, a time-consuming and error-prone process. The transition to a digital system ensures data accuracy, reduces the time required to access and update information, and improves the overall efficiency of the department's activity scheduling process. During the testing phase, conducted between January and august 2024, comparative data was gathered on the training consultation process before and after the application's implementation. Preliminary results indicated a significant improvement in the efficiency and productivity of the maintenance department, comparable to other projects that have utilized PowerApps as a quick and cost-effective solution.
  • Imagem de Miniatura
    Item
    Aumento da confiabilidade na produção pela implementação de planos de manutenção preventiva
    (2023-05-04) Silva, Deiverson José da; Simões, Thiago Araujo; http://lattes.cnpq.br/7903824177570749; https://lattes.cnpq.br/4121093660977324
    The lack of functional preventive maintenance in the production line of any factory entails several corrective maintenances, thus impacting performance, cost and productivity indicators. This work will address the use of the PDCA cycle as a methodology, as well as the 5W1H to identify the phenomenon and the 5 whys to find the root cause of the problem, respectively. Based on this, preventive maintenance plans for production lines were implemented in the “Manusis” asset management system. The system automatically generates the OM's (maintenance orders) for the maintainers to carry out the scheduled activities. In this way, it verified an efficiency in the performance of the production line due to the improvement of 32.78% in corrective maintenance, in addition to having obtained an average improvement of 3.58% in the MTBF (mean time between failures) and an average reduction of 3.59% in MTTR (mean time to repair).
  • Imagem de Miniatura
    Item
    Estudo de caso: Implantação do método de planejamento e controle da manutenção (PCM) como estratégia para o aumento da confiabilidade e disponibilidade dos ativos no setor de manutenção agrícola de uma usina de cana de açúcar da região Nordeste
    (2022-05-24) Silva, Kerolly Thallya Pimentel Batista da; Centeno González, Felipe Orlando; http://lattes.cnpq.br/9688427609049172; http://lattes.cnpq.br/5671236699389554
    This work is a case study that aims to demonstrate the importance of management in maintenance processes. Theoretical concepts that approach maintenance management in order to make the reader familiar with the subject and therefore portrayed in the practice of maintenance planning and control (PC) in the maintenance sector of a sugarcane sector implantation plant in the region North East. Through the computerized system announcements of the high-value company announcements of the high reliability of the chaotic reality of the low and the high unavailability of data generated by the cost and maintenance index of the maintenance of the maintenance of the cost and the high of the possible was the need for the sector to be responsible for maintenance management was verified. In this way, the maintenance planning and control sector (PCM) was planned, which is a maintenance area that strategically aims to process the processes of this segment. This study shows the importance of analyzing the performance indicators originated after the implementation of the PCM and as the case of decision making with greater precision and agility, resulting in an increase in the profitability of the organization.